Visual adapted from the project
Residential · Drainage
Foundation drain and site grading
Montreal
Better drainage around the building and a lower risk of water infiltration.
Condominium · Civil site work
Redo the parking stall marking during the rehabilitation and resurfacing of the parking membrane.
Topographic survey of the parking area, location of existing features and design of the new stall marking.
Visual adapted from the project
Residential · Drainage
Montreal
Better drainage around the building and a lower risk of water infiltration.
Project illustration
Industrial · Stormwater
Lavaltrie
Stormwater retention and flow control for an industrial project.
Project illustration
Industrial · Roof retention
Montreal — Lachine
Roof retention and flow regulation, in line with City of Montreal requirements.
Tell us about the situation: we will point you to the right next step.