Before you buy a lot or commit to design fees, a civil feasibility study by Terraxis Conseil shows what the civil engineering will make possible, complicated or costly: municipal networks, drainage, retention, grades and applicable requirements. For developers, architects, contractors and landowners in Greater Montreal and elsewhere in Quebec.
The support is modular. You can start with a feasibility study before committing to design fees, and stop there. Not every mandate includes every step.
Your needs, the documents available, the intended use, the known constraints and the professionals already involved.
Visit, inspection and measurement of grades and slopes depending on the scope of the mandate; available topographic and LiDAR data; existing drainage.
Land surveying and geotechnical or environmental studies are coordinated with specialists when needed. Terraxis does not produce certificates of location.
Water main, sanitary sewer, storm sewer: possible connections, depths, and the requests to send to the municipality.
A feasibility analysis is not an official confirmation of capacity, nor an authorization.
Municipal requirements, Montreal’s By-law 20-030 and the City’s stormwater requirements, flood zones and other civil constraints.
Comparison of scenarios for connections, retention, infiltration, drainage and grading.
Preliminary sketches, layout, interfaces with the building, phasing.
Earthworks, networks, drainage, retention, pavements, structures and contingencies, with the assumptions, exclusions, stage of definition and level of uncertainty.
Scenarios, recommendations, risks, steps to take, and the transition to plans and specifications.
What a feasibility study checks
Schematic plan, not to scale. A feasibility analysis is not an official confirmation of capacity, nor an authorization.
The preliminary budget estimate puts a figure on the civil works of the chosen scenario: earthworks, networks, drainage, retention, pavements, structures and contingencies. It states its assumptions, its exclusions, the project’s stage of definition and its level of uncertainty.
It is neither a bid nor a guaranteed price: it is an order of magnitude to support a decision, refined as the project takes shape. It does not replace a geotechnical study, which can significantly change earthwork and foundation costs.
The feasibility report brings together what was checked and what it means for your project.
In the report
Previous experience of our technical director
Before Terraxis Conseil, our engineer took part, with other firms, in a 350-dwelling project in Candiac and a 62-dwelling project in Boisbriand (retention and automated pumping).
Your request is picked up within 48 hours: an engineer replies and agrees on the next step with you. This is the time to a first reply, not the time to a site visit or to delivery of the documents.
Once we have reviewed your request, the service proposal sets out the scope of the mandate, its steps and its schedule. We do not quote a standard turnaround before seeing the file.
We compare the options, the quantities and their effect on construction costs, to settle on a solution that is compliant, durable and reasonable to build.
An engineer who is a member of the Ordre des ingénieurs du Québec takes charge of your file and remains your contact throughout the mandate.
We favour a site visit and measurements suited to the project, taken with recent measuring equipment. A mandate carried out on documents alone is always identified as such.
As early as possible: ideally before buying the lot or during the due diligence period of a conditional offer, and at the latest before the architectural concept is frozen. Civil constraints are far easier to design around than to correct afterwards.
No. It analyzes the possible connections from the available data and prepares the requests to be sent to the municipality. Confirmation of capacity and authorizations come from the municipality.
No. It is an order of magnitude for the civil works, stated with its assumptions, its exclusions and its level of uncertainty. It is meant for deciding and planning, not for replacing contractors’ bids.
No. Those mandates go to specialized firms and to a land surveyor. We coordinate their work with the civil study when it is needed.
Yes. The support is modular: the study may be all you need to make your decision. If the project goes ahead, it becomes the basis for the plans and specifications.
It depends on the size of the lot, the complexity of the project, the data available and the steps you choose. Request an estimate: the service proposal sets out the scope and the schedule before we start.
Yes. Our projects are handled by an engineer who is a member of the Ordre des ingénieurs du Québec, under the direction of a member with more than 10 years of experience. The name and member number of our technical director appear on our About page.
Sewer depth, capacity, water main, storm discharge point: why check the municipal services before buying a lot or starting design.
When an authorization is needed, who reviews it and what documents to provide: what Montreal By-law 20-030 changes for stormwater management in projects.
Send us the address or lot number, the intended project and the documents you have: an engineer replies within 48 hours.