A condominium with an entrance or openings below street level
- Starting point
- The building has a garage ramp that goes down from the street, or openings close to sidewalk level. The board is planning work and the borough asks for a civil engineering report.
- On site
- The engineer measures the grades of the street, the top of the ramp, the thresholds and the openings, and identifies the points where surface water could get in.
- Analysis
- These grades are compared with the level that water can reach in an intense rainfall, and the risk is assessed for each point of entry.
- Usual recommendations
- Prevention measures suited to each point of entry and to the planned work. The choice depends on the measured grades: there is no standard solution.
- Deliverable
- A civil engineering report specific to the building: findings, measurements, analysis, risk assessment and recommendations.