Rehabilitating a condominium parking lot: where do you start?
Assessment, slopes, drainage, pavement structure, plans and specifications: the steps to plan a parking lot rehabilitation and compare contractors’ bids.
Need a parking lot design engineer? Terraxis Conseil designs the rehabilitation and layout of parking lots, yards and site access for condominiums, property managers, businesses and industrial owners in Greater Montreal: slopes, drainage, pavement structure, curbs, and plans and specifications, with support during construction depending on the mandate.
Puddles that never dry, ice in winter, cracks, settlement around the catch basins: a worn parking lot usually tells you where the water goes, or does not go. Before repaving, you need to know why the lot deteriorated.
Three things decide how long the new surface will last: the slopes that carry water to the catch basins, the drainage that takes it away, and the pavement structure under the asphalt. That is what we check and design.
What a parking lot rehabilitation has to get right
Schematic section, not to scale. Thicknesses and slopes depend on the site and on the soil data available.
A single engineer takes charge of the civil design, so that slopes, drainage and surfaces work together.
Covered by the mandate
For grading plans on their own, see site grading plans and layout.
Every surface is given a slope and a direction: drive aisles, stalls, pedestrian crossings, street entrances. We look for the balance between a slope steep enough to drain the surface and gentle enough for pedestrians, wheelchairs and vehicles, winter included.
The number and position of the catch basins follow from those slopes, not the other way around. We size the pipes that connect them, check their outlet and, where the municipality requires it, provide retention and flow control. See Drainage & stormwater management.
The thickness of the base and sub-base depends on the soil in place, on frost and on the loads: the aisle that delivery or collection trucks drive on needs more than the rows of stalls. We set the pavement structure from the recommendations of the geotechnical study, which we coordinate with a specialized firm.
On the plans
Drive aisles, stalls, the delivery area, the dumpster pad and a storefront plaza do not carry the same loads. We assign each zone the surfacing that suits its use, then draw the transitions between materials.
To compare the surfacing options, see our article: Designing a parking lot: paving, sidewalks, curbs, concrete bases and choice of materials.
Curbs and sidewalks are the first works to suffer from freezing, thawing, de-icing salts and snowplow blades. Their service life comes down to details: the base that carries them, the concrete mix, the location of the joints and the slope that keeps water from sitting on them.
For sidewalks, curbs and exterior slabs in concrete that is not structurally reinforced, exposed to freeze-thaw cycles and de-icing salts, standard CSA A23.1 specifies exposure class C-2. Structurally reinforced works fall under a class set in the specifications.
Accessible stalls are placed near the entrance, on a gently sloped surface, and linked to the door by a barrier-free route: lowered curb, gentle slope, no low point where water freezes. The number and dimensions of accessible stalls are set by the municipal by-law and the Construction Code; we check them for each project.
The plan shows where snow will be pushed and piled: storage areas located downstream of pedestrian routes, so that meltwater reaches a catch basin without refreezing on a sidewalk. Islands, curbs, bollards and bases are laid out to let the equipment through.
Checked at design
Light poles, EV chargers, gates and signs sit on concrete bases linked by buried conduits. When nobody places them on the civil plan, new pavement gets saw-cut to add them. We plan where each base goes, its finished grade, the conduits leading to it and the drainage around it, so that no base ends up in a low point or in a snowplow’s path.
The structural design of the bases is coordinated with a structural engineer. Lighting and electrical work belong to specialized professionals: we work from their plans.
For the trenches and conduits of a charging project, see Civil engineering for EV charging and electrical infrastructure.
What we plan
A successful parking lot needs everyone to know what is theirs. Here is the usual split; the service proposal sets out the one for your project.
You describe the lot, its problems and what you plan to do. We review the existing plans and the maintenance history, when they are available.
Grades, slopes, catch basins, condition of the surfaces and curbs: the lot is measured and photographed with recent equipment suited to the project.
Where does water pond, and why? We analyze the slopes, the drainage and the pavement structure, based on the data available.
Soil borings or a geotechnical study are coordinated with a specialized firm when the condition of the base calls for them.
Resurfacing, partial or full reconstruction, drainage corrections: we compare the options, the quantities and their effect on construction costs.
Grading and drainage plans, details and specifications give every contractor the same basis for pricing.
Targeted site visits or partial inspection, depending on the mandate, and answers to the contractor’s technical questions.
Depending on the mandate, the file includes:
Depending on the mandate
Structural slabs, multi-level parking structures and waterproofing membranes belong to a structural engineer or a building envelope specialist. Soil characterization is the work of a geotechnical firm. We coordinate the civil design with them.
Your request is picked up within 48 hours: an engineer replies and agrees on the next step with you. This is the time to a first reply, not the time to a site visit or to delivery of the documents.
We compare the options, the quantities and their effect on construction costs, to settle on a solution that is compliant, durable and reasonable to build.
Once we have reviewed your request, the service proposal sets out the scope of the mandate, its steps and its schedule. We do not quote a standard turnaround before seeing the file.
An engineer who is a member of the Ordre des ingénieurs du Québec takes charge of your file and remains your contact throughout the mandate.
We favour a site visit and measurements suited to the project, taken with recent measuring equipment. A mandate carried out on documents alone is always identified as such.
Findings, possible causes, risks and recommendations are specific to your situation, not boilerplate carried over from one file to the next.
With an assessment of what is there: grades, slopes, drainage and the condition of the surfaces. That is what makes it possible to choose between resurfacing and reconstruction, and then to prepare plans and specifications on which every contractor bids on the same basis.
As soon as the work changes the slopes, the drainage or the pavement structure, an engineer’s plans and specifications give the bids a common basis and make it possible to check the work. The municipality may also require plans for certain projects: we check what applies to yours.
It depends on the cause of the deterioration. If the base is sound and the slopes work, resurfacing may be enough. If water ponds, the base is failing or the drainage no longer works, a new surface laid on the same defects will fail the same way. The assessment settles the question.
It can, depending on the municipality and on the extent of the work. In Montreal, for example, a by-law governs stormwater discharge for certain projects. We check what applies before the design is set.
Depending on the mandate: targeted site visits or partial inspection, and answers to the contractor’s technical questions.
By the use of each zone, the loads, the maintenance you are prepared to do and the budget. Asphalt suits most aisles and stalls; concrete, heavy or concentrated loads; pavers, pedestrian areas and plazas. A single parking lot often combines several surfacings.
Sometimes, in part. It depends on the soil, the depth of the water table, the reservoir base and what the municipality recognizes in its calculations. We check it by calculation before proposing it, and we plan for its maintenance.
We plan where they go, their grades, the conduits and the drainage. A structural engineer handles the structural design of the bases, which we coordinate; lighting and electrical work are entrusted to specialized professionals.
No. We design the parking lot, prepare the plans and specifications and, depending on the mandate, inspect the work. The contractor you select builds, and is responsible for the means and methods and for site safety.
It depends on the area, the condition of the lot, the data available and the level of support wanted during construction. Request an estimate: the service proposal sets out the scope and the schedule before we start.
Yes. Our projects are handled by an engineer who is a member of the Ordre des ingénieurs du Québec, under the direction of a member with more than 10 years of experience. The name and member number of our technical director appear on our About page.
Assessment, slopes, drainage, pavement structure, plans and specifications: the steps to plan a parking lot rehabilitation and compare contractors’ bids.
Asphalt, concrete or pavers, sidewalks, curbs, light pole bases: what a developer or contractor should decide before paving a parking lot.
Scope of the mandate, site visit and measurements, area, complexity, municipal requirements, urgency: what makes the cost of a civil engineering mandate vary.
Tell us about the lot, its problems and your timeline: an engineer replies within 48 hours.