Montreal By-law 20-030: what it changes for stormwater management in projects

When an authorization is needed, who reviews it and what documents to provide: what Montreal By-law 20-030 changes for stormwater management in projects.

Is my project subject to By-law 20-030?

According to the City of Montreal, an authorization must be requested notably when the lot has more than 1,000 m² of impervious surfaces after the work, or when the work includes a domestic water service of 100 mm or more. For a borderline case, check directly with the City before designing.

In Montreal, By-law 20-030 (Règlement sur les branchements aux réseaux d’aqueduc et d’égout publics et sur la gestion des eaux pluviales) governs how a building connects to the City’s water and sewer networks and manages its rainwater. For a real estate project, it mainly means an authorization to obtain and calculations to provide. It is better to plan for them from the design stage.

Which projects must request an authorization?

According to the City of Montreal, an authorization must be requested notably when:

  • after the work, the building’s lot has more than 1,000 m² of impervious surfaces;
  • the work includes the installation of a domestic water service of 100 mm or more.

Under the by-law, any surface other than lawn or vegetation counts as impervious. For a borderline case, check directly with the City before designing.

Who reviews the request?

The request is reviewed by the water management regulation section (Section de la réglementation de la gestion de l’eau, SRGE) of the City of Montreal’s water department. That is why people often refer to “SRGE criteria” on Montreal projects.

What has to be provided?

The request is made with the City’s form, together with the plans, documents and information needed to assess whether the proposed stormwater management system complies. The hydrologic and hydraulic calculation of its performance must be done with software compatible with SWMM (Storm Water Management Model).

Two deadlines to know:

  • an incomplete or non-compliant request must be corrected within 60 days of the City’s notice;
  • the final as-built plans must be sent within 60 days of the end of the work.

Once the system is built, the owner must keep it in good condition and keep a record of its maintenance.

What does it provide for retention and flow?

For a building whose stormwater is discharged to the sewer, the by-law sets a maximum discharge rate. It corresponds to a discharge rate per hectare, which varies by sector, for a design storm defined in the by-law. The excess water is held back temporarily on the site (on the roof, at the surface or in an underground structure), then released in a controlled way.

The regulator is what limits the flow discharged. The by-law lists the accepted devices, including vortex regulators, orifice plates and controlled-flow roof drains. See roof target flows and discharge control.

What are the impacts on design?

For architects and developers, the effects are felt from the first sketch:

  • space: the retention volume has to find its place, on the roof or on the lot;
  • structure: roof retention affects the structure and the waterproofing;
  • grades: the grades of the building and the lot must allow water to flow toward the structures and the network;
  • budget: retention and flow control structures have a cost that is better planned for early.

Some boroughs add their own requirements, for example near basin (“cuvette”) areas.

In summary

By-law 20-030 makes stormwater management a full part of the design of Montreal projects. The earlier it is taken into account (authorization required or not, discharge point, room for retention), the less it weighs on the project. Do you have a project in Montreal? See how we work with architects, developers and contractors, then send us your project.

Frequently asked questions

What counts as an impervious surface?

Under the by-law, any surface other than lawn or vegetation counts as impervious.

Who reviews the request?

The water management regulation section (Section de la réglementation de la gestion de l’eau, SRGE) of the City of Montreal’s water department.

What software must be used for the calculations?

The hydrologic and hydraulic calculation of the system’s performance must be done with software compatible with SWMM (Storm Water Management Model).

What happens after the work?

The final as-built plans must be sent within 60 days of the end of the work. The owner must then keep the system in good condition and keep a record of its maintenance.